+962 6 585 5533

info@meisolar.com

PORJECTS

Safeway Shopping Mall

MEI installed a space heating system comprised of 140 collectors and two heat exchangers to heat and provide hot water for the 10,000m² commercial mall that is in operation 24 hours a day. The system is integrated with the boiler whereby regional cooperation is anticipated.

The client was motivated by the need to reduce diesel cost and short payback period of two years. The project was implemented in four weeks, and serves as a demonstration project for further replication across the MENA region.