+962 6 585 5533

info@meisolar.com

PORJECTS

Siniora Foods Industries

120 m2 of Heat Pipe EV solar collectors were used evacuated collectors to support the steam boilers

Factory received 30% grant of system cost from JUMP initiative and balance was paid by client.

System was designed and retrofitted into existing boiler system in April 2010 with an expected lifetime of 25 years.