CPC advanced evacuated collectors are used to support the steam boiler
80 Collectors on factory roof connected smoothly to a 30 m3 storage tanks.
System resulted into a payback is less than 4 years with a lifetime of 25 years
System was designed and retrofitted into existing boiler system in less than 4 months in the year 2010