Chamber of Commerce – Aqaba

EU funded EPC Retrofit of a 150Sqm FP panels on the roof of the JOCC building in Aqaba to produce hot water at low temperature (Approx. 80 to 90 Deg. C) driving an absorption chiller to produce chilled water at a temperature lower than existing chiller return temperature. This will lead to significantly reduce the […]

Jordan Oil Terminal Company – JOTC

EPC contract for a 1500 SqM FP panels system (1.2 MWth) to provide heating for two 43K cubic meter HFO storage tanks in Aqaba in 2022, supplying the required heat to maintain the viscosity of the HFO. Consultant: National Energy Research Center

Masdar University – Abu Dhabi

Consultant  : CH2MHill Completed in June 2010 International Competition Solar System to provide the whole university various facilities with domestic Hot Water Unique Heat Pipe Solar Collector Technology Design and installation  collectors on steel structure framing  platform. Savings:  50,000 L of Diesel Fuel/Year

Nabil Foods Factory

CPC advanced evacuated collectors are used to support the steam boiler 80 Collectors on factory roof connected smoothly to a 30 m3 storage tanks. System resulted into a payback is less than 4 years with a lifetime of 25 years System was designed and retrofitted into existing boiler system in less than 4 months in […]

Siniora Foods Industries

120 m2 of Heat Pipe EV solar collectors were used evacuated collectors to support the steam boilers Factory received 30% grant of system cost from JUMP initiative and balance was paid by client. System was designed and retrofitted into existing boiler system in April 2010 with an expected lifetime of 25 years.

Nestle Water Factory – KSA

Industrial hot water production for process use in bottle washing. Commissioned in Year 2012 515 m2 FP Solar Thermal Collectors and 15,000 liters of hot water storage tanks. Payback of less than 5 years

Marriott Dead Sea Resort

Domestic hot water supply and swimming pool heating – retrofit Fuel Savings   65%     Payback:  Less than 4 years

Saudi Aramco – KAPSARC

EPC contract to provide domestic hot water for 191 residential villas and 7 administrative buildings. A combination of specialized flat plate panels and stand-alone solar water heaters are used.

Safeway Shopping Mall

MEI installed a space heating system comprised of 140 collectors and two heat exchangers to heat and provide hot water for the 10,000m² commercial mall that is in operation 24 hours a day. The system is integrated with the boiler whereby regional cooperation is anticipated. The client was motivated by the need to reduce diesel […]

Princess Noura University for Women (PNUW)

Millennium Energy Industries (MEI) has been awarded in January of 2010 the contract to design, build, commission and provide initial maintenance for the largest solar district hot water project in the world, for the Princess Noura Bint Abdurrahman University for Women Project (PNUW) in Riyadh, Saudi Arabia. The solar system, comprised of more than 36,000 […]