PORJECTS

Chamber of Commerce – Aqaba

EU funded EPC Retrofit of a 150Sqm FP panels on the roof of the JOCC building in Aqaba to produce hot water at low temperature (Approx. 80 to 90 Deg. C) driving an absorption chiller to produce chilled water at a temperature lower than existing chiller return temperature.

This will lead to significantly reduce the electrical energy consumption needed to cool the building.

The expected CO2 savings of the project is approx. 4400 Kg