+962 6 585 5533
info@meisolar.com
EPC contract for a 1500 SqM FP panels system (1.2 MWth) to provide heating for two 43K cubic meter HFO storage tanks in Aqaba in 2022, supplying the required heat to maintain the viscosity of the HFO.
Consultant: National Energy Research Center