News
READ OUR BLOG
Our News
New Solar Project with Al-Ayoubi Factory
We are thrilled to announce our partnership with Al-Ayoubi Factory for a new PV solar project! This 180 kWp system is designed to include both
Tamam Food
Tamam Foods Enhances Its Green Strategy and Adopts Solar Thermal Combined with Heat Pump to Totally Rid Itself of Fossil Fuel in Its Industrial Operations.
Presentation at Amman Chamber of Industry
MEI introduced solar thermal solutions combined with heat pump for 45 industrial attendants explaining the advanced recent 100% fuel saving solutions with 2-3 years payback
Chamber of Commerce – Aqaba
EU funded EPC Retrofit of a 150Sqm FP panels on the roof of the JOCC building in Aqaba to produce hot water at low temperature
Jordan Oil Terminal Company – JOTC
EPC contract for a 1500 SqM FP panels system (1.2 MWth) to provide heating for two 43K cubic meter HFO storage tanks in Aqaba in
Partnership with UBM KSA
MEI and along with its partner UBM (Part of Al Rashed Group) has launched renewable energy services in KSA and jointly operating out of UBM
Moving to Our New Offices
in October 2021 MEI moved to its new offices at 96 Abdulhamid Sharaf Street – Shemesani. An energy Efficient well-constructed building with impeccable services, ready
The launch of a 134KWp on-grid PV solar project for Al-Nisr Al-Arabi insurance Co.
MEI is designing and implementing a 134KWp on-grid PV solar project for Al-Nisr Al-Arabi Insurance Co. The PV solar system will be commissioned and built
MEI has signed an EPC contract with Maan Governmental Hospital to Expand the Existing Solar Thermal Project.
Following the positive results that the Maan Government Hospital saw from the solar thermal system installed by MEI a year ago, the hospital decided to expand the system and signed an EPC contract with MEI to install a solar thermal system for domestic hot water in the nursing building.
King Abdullah Financial District Solar Thermal projects
The Kingdom of Saudi Arabia is heading towards green and renewable energy. MEI was selected to be part of this major transition by designing, installing, testing,